Line Balancer Pro

Lean Manufacturing System • Takt vs. Cycle Efficiency

Customer Demand (Takt)
Required Takt Time:
2.40 min
5-Station Flow Diagram
Cycle (Min):
Cycle (Min):
Cycle (Min):
Cycle (Min):
Cycle (Min):
Total Lead Time --
Line Efficiency --
Critical Bottleneck --

LEAN INSIGHT: Any station exceeding the White Takt Line is a bottleneck. To balance the line, redistribute tasks from the bottleneck station to "hungry" stations (those with low cycle times).

Verified against: Lean Six Sigma - Theory of Constraints (TOC)